Skip to content

Engineering

Business field
Anyang Bakdal STP : APD & EXE
Gosung tap water supply /distribution control & management system : APD
Hanam modernization of environmental infra facility and park construction : APD & EXE
Algeria El-harrach river restoration APD & EXE

Multipurpose dam

Solid waste incineration facility

Storm water pumping station

Port / Tide gate

Water supply facility

Food waste recycling facility

Optimum management of water pipe network

Hydrologic monitoring / Flood management

Wastewater treatment facility

Renewable energy

Road, Tunnel

Building

Multipurpose dam
Solid waste incineration facility
Storm water pumping station
Port / Tide gate
Water supply facility
Food waste recycling facility
Optimum management of water pipe network
Hydrologic monitoring / Flood management
Wastewater treatment facility
Renewable energy
Road, Tunnel
Building
References
  • T/K basic design for Yangsan bio-gasification facility T/K for Busan sewage sludge treatment facility
  • T/K for Ulsan city’s organic waste bio-gasification facility installation project Working design for new plant tissue culture room of agricultural technology center
  • T/K for, Chungnam provincial office automatic waste collection facility Electricity and other construction design for new Guam high school building
  • Basic and working design service for Songdo food waste disposal facility Construction design service for Gimpo east coast branch office (old) utilization project
  • Extension design service for Ochang dormitory (Dormitory No.2) Working design for integrated marine village development project
  • T/K for Saemangeum basin CSOs and first rainwater treatment system Working design for Gyeongnam hospice building extension construction
  • Basic design service for Bakdal, Anyang P/J Design for Aja area farming village
  • Working design service for Paju wastewater treatment facility Working design for Jinbo market facility modernization project
  • Basic and working design for Beoti Gogae ecology path development project Working design service for Dongrim area’s integrated farming village development project
  • T/K basic design for Unmun dam emergency spillway Repair design service for Ilsandong high school (2 other schools) power facility
  • Basic and working design service for water supply facility of Myeongnye/Gijang industrial complex Master plan of improvement of water supply & wastewater treatment in Laos
  • T/K basic design for optimum water supply network management system construction project (Goseong-gun) Hanam city’s basic environmental facility modernization and park construction project
  • New construction design for Geojae city disabled childcare center APD(basic design) and EXE(working design) for El Harrach river restoration construction
  • Working design for Mupung community health center